My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-12_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2020-03-12_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 5:00:10 AM
Creation date
3/16/2020 9:51:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
3/12/2020
Doc Name Note
& Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
SL22
Permit Index Doc Type
Findings
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> Task description: Grade spoil side of pit ramp <br /> Permit Action: Phase I/III Bond <br /> Release SL-13 and <br /> Site: New Horizon Mine PR-6 Permit/Job#: C 1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 007 State: Colorado Abbreviation: None <br /> Date: 12/18/2012 County: Montrose Filename: C008-007 <br /> User: SLB <br /> Agency or organization name: Colorado Division of Reclamation,Mining and Safety <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: OBSOLETE-Cat D9T-9U <br /> Horsepower: 405 <br /> Blade Type: Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $95.80 NA <br /> Operating Cost/Hour: $111.03 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.24 NA <br /> Total unit Cost/Hour: $248.07 <br /> Total Fleet Cost/Hour: $496.14 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 81,639 <br /> Swell factor: 1.000 <br /> Loose volume: 81,639 LCY <br /> Source of estimated volume: Map 3.02.2-5 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 150 feet <br /> Unadjusted hourly 952.6 LCY/hr <br /> production: <br /> Materials consistency Partly consolidated stockpile 1.1 <br /> description: <br /> Average push -20% <br /> gradient: <br /> Average site altitude: 5,700 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock, 50%Earth <br /> CMCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.