Laserfiche WebLink
DRILLING AND EXPLOSIVES PREPARATION TIME <br /> Total Drilling Length: 264 linear feet <br /> Unadjusted Drilling Rate: 187.00 feet/hour <br /> Drilling Time: 2.22 hours <br /> Job Condition Corrections: <br /> Site Altitude: 5,700 feet <br /> Altitude Adjustment: 0.95 (DRMS est.) <br /> Job Efficiency Factor: 0.67 (CH. Exc.HB) <br /> Adjusted Drilling Rate: 119.03 feet/hour <br /> Explosives Prep.Time: 10.24 hours <br /> JOB TIME AND COST <br /> Total Job Time: 12.46 Hours <br /> Unit cost: $2.756 per cu.yd. Total Job Cost: $4,777 <br /> CMCES Cost Estimating Software <br />