My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-12_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2020-03-12_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 5:00:10 AM
Creation date
3/16/2020 9:51:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
3/12/2020
Doc Name Note
& Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
SL22
Permit Index Doc Type
Findings
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 18 of 37 <br /> Payload Capacity: 39.99 LCY <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 15.00 LCY <br /> Heaped Volume: 18.00 LCY <br /> Average Volume: 16.50 LCY <br /> Adjusted Volume: 18.00 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 16.56 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 9.200 LCY(heaped) <br /> Bucket Fill Factor: 0.900 Other- soil,boulders,roots(80-100%)0.900 <br /> Adjusted Capacity: 8.280 LCY <br /> Job Condition Corrections: Site Altitude(ft.): 5700 feet <br /> Truck Loader Source <br /> Altitude Adj: 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill 2 passes <br /> Excavators and Front Shovels: <br /> Truck <br /> Machine Cycle Time vs. Job Condition Rating: NA <br /> Selected Value within this Basic Rating: NA <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump, 0.575 minutes <br /> maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Material up to 1/8"diameter 0.02 0.020 (Cat HB) <br /> Stockpile: Dumped by truck 0.02 0.020 (Cat HB) <br /> Truck Ownership: Common ownership of trucks and loaders- -0.040 (Cat HB) <br /> 0.04 <br /> Operation: Constant operation-0.04 -0.040 (Cat HB) <br /> Dump Target: No adjustment-factor not applicable 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.040 minutes <br /> Adjusted Loader Cycle Time: 0.535 minutes <br /> Net Load Time per Truck: 0.635 minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br /> Truck Load Time: 0.635 Minutes Adjusted for site altitude: 0.635 Minutes <br /> Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> Time: <br /> CMCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.