My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-12_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2020-03-12_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 5:00:10 AM
Creation date
3/16/2020 9:51:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
3/12/2020
Doc Name Note
& Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
SL22
Permit Index Doc Type
Findings
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 17 of 37 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Haul TC to Morgan Storage Area(completed-remove) <br /> Site: New Horizon Mine Permit Action: SL22R Permit/Job#: C 1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 45C State: Colorado Abbreviation: None <br /> Date: 2/5/2020 County: Montrose Filename: C008-045C <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 15-18 cy, 6x4 <br /> -Loader: CAT 988H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance-Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 75 NA 100 100 100 <br /> Ownership cost/hour: $28.38 $91.83 NA $103.86 $64.10 $9.27 <br /> Operating cost/hour: $55.36 $71.64 NA $82.26 $56.17 $17.75 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. NA $0.00 NA $0.00 $0.00 $0.00 <br /> cost/hour: <br /> Ripper op.cost/hour: NA $0.00 NA $0.00 $0.00 $0.00 <br /> Operator cost/hour: $32.50 $40.65 NA $41.24 $28.52 $0.00 <br /> Unit Subtotals: $116.23 $204.12 NA $227.36 $148.79 $27.01 <br /> Number of Units: 4 1 0 1 1 1 <br /> Group Subtotals: Work: $669.04 Support: $227.36 Maine $175.80 <br /> Total work team cost/hour: $1,072.20 <br /> MATERIAL QUANTITIES <br /> Initial volume: 9,470 CCY Swell factor: 1.215 <br /> Loose volume: 11,506 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 1,600 Pounds/LCY <br /> Description: Top Soil <br /> Rated Payload: 63,980 Pounds <br /> CMCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.