My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-12_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2020-03-12_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 5:00:10 AM
Creation date
3/16/2020 9:51:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
3/12/2020
Doc Name Note
& Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
SL22
Permit Index Doc Type
Findings
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br /> Scraper Loading Time: 0.60 Minutes <br /> Maneuver and Spread Time: 0.70 Minutes <br /> Job Condition Correction: Site Altitude: 5700 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Travel Time: <br /> Road Condition: Firm, smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (fpm) (min) <br /> 1 350.00 0.00 3.00 3.00 2227 0.40 <br /> Haul Time: 0.40 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (fpm) (min) <br /> 1 350.00 0.00 3.00 3.00 2890 0.35 <br /> Return Time: 0.35 minutes <br /> Total Scraper team cycle time: 2.05 minutes <br /> Adjusted for job conditions: 704.49 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 1,408.98 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 2,817.95 LCY/Hour <br /> Unadjusted unit production/hour: 848.78 LCY/Hour <br /> Optimal Number of Scrapers per push <br /> dozer: <br /> JOB TIME AND COST <br /> Fleet size: 2 Team(s) Total job time: 56.82 Hours <br /> Unit cost: $0.660 /LCY Total job cost: $105,738 <br />
The URL can be used to link to this page
Your browser does not support the video tag.