Laserfiche WebLink
SCRAPER TEAM WORK <br /> Task description: Replace topsoil on 20.02 ac Morgan property, Z1-2(SL22) <br /> Site: New Horizon Mine Permit Action: SL22R Permit/Job#: C 1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 030A State: Colorado Abbreviation: None <br /> Date: 1/29/2020 County: Montrose Filename: C008-30AR <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 631G <br /> -Dozer: Cat D9T-9SU <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker,5,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA NA 50 50 <br /> Ownership cost/hour: $125.39 $121.49 NA NA $64.10 $27.40 <br /> Operating cost/hour: $132.67 $105.84 NA NA $28.09 $20.00 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA $0.00 $0.00 <br /> Ripper op.cost/hour: NA $0.00 NA NA $0.00 $0.00 <br /> Operator cost/hour: $30.86 $41.24 NA NA $28.52 $0.00 <br /> Unit Subtotals: $288.92 $268.57 NA NA $120.70 $47.39 <br /> Number of Units: 4 2 0 0 1 1 <br /> Group Subtotals: Work: $1,692.82 Support: $0.00 Maine $168.09 <br /> Total work team cost/hour: $1,860.91 <br /> MATERIAL QUANTITIES <br /> Initial volume: 145,561 CCY Swell factor: 1.100 <br /> Loose volume: 160,117 LCY <br /> Source of estimated volume: Map 2.05.4-6,21"AB,33"subsoil <br /> Source of estimated swell factor: Division estimate <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight 2,100 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: User Provided Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 38.86 LCY Adjusted Capacity: 29.00 LCY <br />