Laserfiche WebLink
RECLAMATION PLAN (CONT) EXHIBIT E <br /> September 2019 <br /> If the seed is to be broadcast, then the seedbed would be <br /> settled and fairly firm, but left rough enough to catch the <br /> seed and allow some coverage by soil when tracked in by heavy <br /> equipment or harrowed and packed into the surface . Planting <br /> will be less than one (1) inch deep with drill spacing no more <br /> then 8 inches . <br /> (6) Noxious weeds are not a problem on this site . However, if <br /> noxious weeds should invade this site, a weed control program will <br /> be implemented as soon as possible to prevent the spread of these <br /> noxious weeds <br /> WEED CONTROL <br /> The revegetated areas will be monitored closely each spring for <br /> the first two years to determine if noxious weeds are invading the <br /> area. Walsenburg Sand and Gravel Co. has implemented a weed <br /> monitoring and control plan for this mine and have included a copy <br /> in the Appendix for your review. Weed control will be initiated if <br /> the problem becomes serious or if an excessive weed cover is still <br /> present at the end of the second year. In no way should this be <br /> taken to mean that we will try to eradicate all the weeds from the <br /> site . Some weeds are beneficial to the game species in the area, <br /> they provide important protection from the elements during winter <br /> and nesting sites during the spring. Total eradication of weeds <br /> from the site is not necessarily desirable, so we will be using <br /> controls on the noxious weeds and letting the rest grow in select <br /> areas . It may be necessary to control weeds by mowing after the <br /> first year, the feasibility of chemical weed control methods will <br /> be studied should other forms not work. Control of noxious weeds <br /> is important to the state so USDA Extension Service recommendations <br /> will be followed to control them. <br /> (7) It will not be necessary to construct fire lanes or access <br /> roads since this is a rangeland grazing area. The roads will remain <br /> as access both during and after mining. <br /> (8) It is understood by the owner/applicant that planting required <br /> for reclamation may be delayed, through the period of use related <br /> to placing of haulage roads, and road cuts . All industry standards <br /> for such storage will be used to stabilize the surfaces . The <br /> owner/applicant is aware that no <br /> planting is required on these areas, as follows : <br /> 18 (REVISED 3/6/2020) <br />