Laserfiche WebLink
v <br /> C. <br /> LARRY E.O'BRIAN 7985 VANCE DRIVE,SUITE 205A <br /> FOUNDER ARVADA,COLORADO 80003 <br /> STEVAN L. O'BRIAN 303-423-7297 <br /> PRESIDENT �\ FAX 303-423-7599 <br /> March 6, 2020 <br /> Mr Patrick Lennberg RECEIVED <br /> Division of Reclamation, Mining & Safety <br /> 1313 Sherman St., Suite 215 MAR 0 6 2020 <br /> Denver, CO 80215 <br /> DIVISION"OF RECLAMATION <br /> MINING AND SAFETY <br /> Dear Patrick; <br /> RE: The Walsenburg Sand and Gravel Company - Sand Arroyo Pit - M-1978-283 <br /> Preliminary Adequacy Response 01 <br /> On behalf of my client The Walsenburg Sand and Gravel Company, I am responding <br /> to your adequacy review letter dated December 9, 2019. I have included your review <br /> points that need to be addressed in the order presented in this cover letter so the <br /> questions and answers will be in the same document for easy future reference. <br /> During this response I found a mistake on all of the maps that showed the water <br /> flow area is in the wrong location on the east side of the mine. I had it comming into the <br /> processing area when it should have been on the northern side of the settling pond. The <br /> channel to the east is narrower where it enters the mine site and then spreads out wider <br /> where WSG has mined on the western part of the Permit area. The Plant Ssite and the <br /> concrete plant areas are on a level above the floor of the Arroyo not down in the old <br /> channel. I fixed this on all of the maps and because the Plant site and Concrete Plant <br /> areas were on area used prior to permitting. I show that area as being graded only since <br /> there was no soil saved when mining began in that area. <br /> EXHIBIT C - Pre-mining and Mining Plan Map (s) of Affected Lands (Rule <br /> 6 .4 .3) <br /> 1 . Please update the maps, including the Reclamation Plan Map, to <br /> label the 200 foot distance from the permit boundary. <br />