Laserfiche WebLink
Page 6 of 20 <br /> Weight description: Decomposed rock-75%Rock,25%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.200 (CAT HB) <br /> Dozing method: 1.200 (SLOT) <br /> Visibility: 0.800 (POOR) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 1.225 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.697 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.5511 <br /> Adjusted unit 542.39 LCY/hr <br /> production: <br /> Adjusted fleet 1084.78 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.980/LCY <br /> Total job time: 342.65 Hours <br /> Total job cost: S364,176 <br /> CIRCES Cost Estimating Software <br />