My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-05_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-03-05_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:53:18 PM
Creation date
3/6/2020 7:48:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
3/5/2020
Doc Name
Reclamation Cost Update
From
DRMS
To
Trapper Mining Inc
Type & Sequence
TR124
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 20 <br /> BULLDOZER WORK <br /> Task description: N Pit <br /> Site: Trapper Mine Permit Action: TR124 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: A002 State: Colorado Abbreviation: None <br /> Date: 3/5/2020 County: Moffat Filename: COIO-A002 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DI IT- I IU <br /> Horsepower: 850 <br /> Blade Type: Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $268.07 NA <br /> Operating Cost/Hour: $222.10 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.24 NA <br /> Total unit Cost/Hour: $531.41 <br /> Total Fleet Cost/Hour: S1,062.82 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 371,699 <br /> Swell factor: 1.000 <br /> Loose volume: 371,699 LCY <br /> Source of estimated volume: TR124 Appendix A,Table A-3.1 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 325 feet <br /> Unadjusted hourly 984.2 LCY/hr <br /> production: <br /> Materials consistency Loose stockpile 1.2 <br /> description: <br /> Average push -10% <br /> gradient: <br /> Average site altitude: 6,400 feet <br /> Material weight: 3,300 lbs/LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.