My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-05_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-03-05_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:53:18 PM
Creation date
3/6/2020 7:48:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
3/5/2020
Doc Name
Reclamation Cost Update
From
DRMS
To
Trapper Mining Inc
Type & Sequence
TR124
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 20 <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 153.00 LCY <br /> Heaped Volume: 192.00 LCY <br /> Average Volume: 172.50 LCY <br /> Adjusted Volume: 149.15 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 103.08 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 58.900 LCY(heaped) <br /> Bucket Fill Factor: 0.875 Blasted rock-well blasted (80 -95%)0.875 <br /> Adjusted Capacity: 51.538 LCY <br /> Job Condition Corrections: Site Altitude(ft): 6400 feet <br /> Truck Loader Source <br /> Altitude Adj: 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill 2 passes <br /> Excavators and Front Shovels: Truck <br /> Machine Cycle Time vs. Job Condition Rating: ABOVE AVERAGE <br /> Selected Value within this Basic Rating: AVERAGE <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump, NA minutes <br /> maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: NA NA (Cat HB) <br /> Stockpile: NA NA (Cat HB) <br /> Truck Ownership: NA NA (Cat HB) <br /> Operation: NA NA (Cat HB) <br /> Dump Target NA I NA (Cat HB) <br /> Net Cycle Time Adjustment: NA minutes <br /> Adjusted Loader Cycle Time: 0.498 minutes <br /> Net Load Time per Truck: 0.996 minutes <br /> Truck Cvcle Time: <br /> Truck Exchange Time: 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br /> Truck Load Time: 0.996 Minutes Adjusted for site altitude: 0.996 Minutes <br /> Truck Maneuver and Dump 1.20 Minutes Adjusted for site altitude: 1.200 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Firm, smooth,rolling_,dirt/It. surfaced,watered, <br /> maintained 3.0 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.