My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-05_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-03-05_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:53:18 PM
Creation date
3/6/2020 7:48:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
3/5/2020
Doc Name
Reclamation Cost Update
From
DRMS
To
Trapper Mining Inc
Type & Sequence
TR124
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 20 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Backfill and Grading N Pit <br /> Site: Trapper Mine Permit Action: TR124 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: A001 State: Colorado Abbreviation: None <br /> Date: 3/5/2020 County: Moffat Filename: C010-A001 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: KOMATSU 830E <br /> -Loader: CAT 6090 <br /> Support Equipment-Load Area: Cat D10T- IOSU <br /> -Dump Area: Cat DIOT- IOSU <br /> Road Maintenance-Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Shovel Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 25 25 25 25 <br /> Ownership cost/hour: $193.78 $23.07 $140.61 $140.61 $82.71 $68.95 <br /> Operating cost/hour: $213.02 $930.15 $33.84 $33.84 $17.52 $25.83 <br /> %Utilization-riper: NA 0 15 NA NA NA <br /> Ripper own. NA $0.00 $20.29 $0.00 $0.00 $0.00 <br /> cost/hour: <br /> Ripper op. cost/hour: NA $0.00 $1.73 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $34.38 $37.27 $41.24 $41.24 $28.52 $21.09 <br /> Unit Subtotals: $441.17 $990.49 $217.42 $215.69 $128.75 $115.88 <br /> Number of Units: 5 1 1 1 1 1 <br /> Group Subtotals: Work: $3,196.34 Support: $433.11 Maine $244.63 <br /> Total work team cost/hour: $3,874.08 <br /> MATERIAL QUANTITIES <br /> Initial volume: 5,187,693 CCY Swell factor: 1.000 <br /> Loose volume: 5,187,693 LCY <br /> Source of estimated volume: TR124 Appendix A Table A-3.1 <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 3,300 Pounds/LCY <br /> Description: Decomposed rock-75%Rock,25%Earth <br /> Rated Payload: 492,200 Pounds <br /> Payload Capacity: 149.15 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.