My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-05_PERMIT FILE - M2020018
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020018
>
2020-03-05_PERMIT FILE - M2020018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2020 9:23:02 AM
Creation date
3/5/2020 12:12:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020018
IBM Index Class Name
Permit File
Doc Date
3/5/2020
Doc Name
Application
From
Rincon Partners, LLC
To
DRMS
Email Name
THM
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Portable Screen Decks <br />• Portable Stacking Conveyors <br />• Pit to Facilities Area Conveyor belt <br />• Water Truck for dust suppression <br />• Portable Generators for plants <br />• Electric Control Van <br />• Wheel Loader Cat 988, Cat 980 <br />• Cat D-9 size dozer or equivalent <br />• Portable Wash Plant <br />• Raw Material Off -Highway Trucks to haul material within the pit <br />• Highway Haul Trucks — to the facilities area only. <br />Support equipment will come to the site on an as -needed basis. The facilities area will house the <br />mine office, the shop, parts storage and a truck scale. The employee and vendor parking area will <br />also be located here. <br />There wi Il be no blasting as part of this operation. <br />No refuse, acid or toxic producing materials are expected to be encountered in this operation. If <br />these materials are encountered, topsoil will be placed over the area and mining will move to a <br />different area. <br />Any new fencing will be installed according to the Division of Parks and Wildlife's specifications. <br />The operator commits to clearly marking the affected area boundary with stakes surveyed on site, <br />once the permit is approved. It is planned that the material may be used to provide base material for <br />construction projects in the area. <br />One main road will be present in the mining area and will change locations in the pit as mining <br />progresses. This road will access the mining areas, which also is accessed by the new access road. <br />In pit roads are not delineated as they will move throughout mining. <br />Rincon Materials D-7 CM Iwwicki and Associates, PLId <br />February 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.