My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-28_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-02-28_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:48:43 PM
Creation date
3/3/2020 9:36:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
2/28/2020
Doc Name
Adequacy Review
From
Colowyo Coal Company LP
To
DRMS
Type & Sequence
MR215
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br /> Task description: Load,Haul and Regrade Collom Topsoil from 36A <br /> Site: Colowyo Coal Mine Permit Action: MR215 Permit/Job#: C 1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 2/28/2020 County: Moffat Filename: C019-001 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: KOMATSU 830E <br /> -Loader: LETOURNEAU L2350 <br /> Support Equipment-Load Area: Cat DI IT- 11U <br /> -Dump Area: Cat DI IT- 11U <br /> Road Maintenance-Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker, 14,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 100 100 50 50 <br /> Ownership cost/hour: $193.78 $407.68 $268.07 $268.07 $82.71 $84.51 <br /> Operating cost/hour: $213.02 $421.97 $222.10 $222.10 $35.04 $63.80 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. NA $0.00 $0.00 $0.00 $0.00 $0.00 <br /> cost/hour: <br /> Ripper op.cost/hour: NA $0.00 $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $34.38 $40.65 $41.24 $41.24 $28.52 $21.09 <br /> Unit Subtotals: $441.17 $870.30 $531.41 $531.41 $146.27 $169.40 <br /> Number of Units: 4 1 1 2 1 1 <br /> Group Subtotals: Work: $2,634.98 Support: $1,594.23 Maine $315.67 <br /> Total work team cost/hour: $4,544.88 <br /> MATERIAL QUANTITIES <br /> Initial volume: 105,296 CCY Swell factor: 1.125 <br /> Loose volume: 118,458 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,550 Pounds/LCY <br /> Description: Earth-Dry packed <br /> Rated Payload: 492,200 Pounds <br />
The URL can be used to link to this page
Your browser does not support the video tag.