Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclaim Additional Collom Topsoil Stripping <br /> Site: Colowyo Coal Mine Permit Action: MR215 Permit/Job#: C 1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 2/28/2020 County: Moffat Filename: C019-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Load,Haul and Regrade Collom Topsoil from 36A TRUCKI 1 31.93 $145,096 <br /> 002 Reseed Collom Pit and Temporary Spoil Pile REVEGE 1 30.50 $17,431 <br /> 003 Reseed Collom Topsoil Pile Footprint 36A REVEGE 1 2.00 $1,172 <br /> SUBTOTALS: 64.43 $163,699 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $3,307 <br /> Performance bond: 1.05 Total= $1,719 <br /> Job superintendent: 32.22 Total= $2,235 <br /> Profit: 10.00 Total= $16,370 <br /> TOTAL O&P= $23,631 <br /> CONTRACT AMOUNT(direct+O&P)= $187,330 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $3,747 <br /> Reclamation management and/or administration: 1.91 $3,578 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $30,955 <br /> TOTAL BOND AMOUNT(direct+indirect)= $194,654 <br />