Laserfiche WebLink
6.4.5 EXHIBIT E - Reclamation Plan <br /> (a.) Slopes will be a 4 to1 or flatter. In areas the slope may be flat, but will be no more than a 4 to 1. <br /> (b.)All areas will that was disturb in mining operations will be reseeded so vegetation can reestablish. <br /> (c.)There are no ponds as part of the Reclamation Plan. <br /> (d.) The overburden is approximately 24 inches average. <br /> (e.)Average top soil thickness is 6 inches. <br /> Applicant McCormick Excavation And Paving LLC McCormick Pit <br />