My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-02_REVISION - M1977211
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2020-03-02_REVISION - M1977211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:42:59 PM
Creation date
3/2/2020 2:51:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Revision
Doc Date
3/2/2020
Doc Name Note
Response #4
Doc Name
Adequacy Review Response
From
Continental Materials Corporation
To
DRMS
Type & Sequence
AM4
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C CONTINENTAL. MATERIALS CORPORATION <br /> Castle Aggregate <br /> Specifications for Engineered Fill <br /> Pikeview Quarry <br /> Permit No. M-1977-211 AM-04 <br /> February 7, 2020 <br /> 1.0 Engineered Fill <br /> 1.1 Engineered fill is defined as fill, which is selected, placed, and compacted to an <br /> appropriate specification so that it will perform to the required engineered behavior. <br /> 1.2 Fill shall be classified as: <br /> a. General Fill <br /> b. Unsuitable fill <br /> c. Restricted fill <br /> d. Hazardous fill <br /> e. Special fill <br /> 1.3 Unsuitable fill shall comprise materials designated as: <br /> a. Cohesive soils having a liquid limit of greater than 40 or plasticity index greater <br /> than 65. <br /> b. Any material containing more than 5% of organic material or biodegradable <br /> material. <br /> c. Any material from hazardous contaminated sites. <br /> d. Any material designated as unsuitable by the engineer that cannot be properly <br /> placed and compacted due to shape, size, or substance. <br /> 1.4 We will not import any restricted fill or hazardous fill to this site <br /> 1.5 Special fill shall be comprised of concrete rubble as broken down in the demolition <br /> process or delivered in a rubble state from special construction sites as concrete only <br /> that is free of rebar or contaminates. No size shall be greater than 12" in any <br /> dimension. Concrete shall be broken by mechanical breaker to suitable sized rubble. <br /> All rebar shall be removed by equipment and hand labor and delivered to an <br /> Pikeview Quarry Amendment 4 <br /> D-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.