Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Final Reclamation <br /> Site: Thomas Gravel Pit 4 Permit Action: SI01 Permit/Job#: M 1981286 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 2/24/2020 County: Weld _ Filename: _M286-000 <br /> User: ECS <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet 1 Task <br /> _ _Description _ ___ _ Used Size Hours Cost <br /> 001 Backfill 1000 feet of 10'highwall to 3:1 ; DOZER T 1 36.89 $6,487 <br /> 002 Replace 6"topsoil over 52 acres SCRAPERI 1 61.60 $48,163 <br /> 003 Reveg 52 acres REVEGE 1 16.00 $68,337 <br /> 004 Mob/Demob MOBILIZE 1 5.60 $6,291 <br /> SUBTOTALS: 120.09 $129,278 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total = $2,611 <br /> Performance bond: 1.05 Total= $1,357 <br /> Job superintendent: 0.00 Total= $0 _ <br /> Profit: 10.00 Total = $12,928 <br /> TOTAL O&P= $16,89_7 _ <br /> CONTRACT AMOUNT(direct+O&P)_ $146,175 <br /> LEGAL_ -ENGINEERING -PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0 <br /> Reclamation management and/or administration: 5.00 $7,309 <br /> CONTINGENCY: 0.00 Total = $0 <br /> TOTAL INDIRECT COST= $24,705 <br /> TOTAL BOND AMOUNT(direct+indirect)= $153,983 <br />