My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-20_INSPECTION - M2009006
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2009006
>
2020-02-20_INSPECTION - M2009006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2020 1:43:08 PM
Creation date
2/20/2020 12:47:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009006
IBM Index Class Name
Inspection
Doc Date
2/20/2020
Doc Name
Returned Mail
From
DRMS
To
Colorado Quarry, LLC
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task#006 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: BERTHOUD <br /> Total one-way travel distance: 10.50 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $2,696.37 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost ** <br /> **one round trip,no haul rig: $5.44 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> E•ui•ment E•ui•ment <br /> Haul Time(Hours): 0.21 0.21 <br /> Return Time(Hours): 0.21 0.21 <br /> Loading Time(Hours): 0.60 NA <br /> Unloading Time(Hours): 0.60 NA <br /> Subtotals: 1.62 0.42 <br /> JOB TIME AND COST <br /> Total job time: 3.24 Hours <br /> Total job cost: $2,702 <br /> • <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.