Laserfiche WebLink
Mobilization Worksheet Cont'd Task#006 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: BERTHOUD <br /> Total one-way travel distance: 10.50 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $2,696.37 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost ** <br /> **one round trip,no haul rig: $5.44 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> E•ui•ment E•ui•ment <br /> Haul Time(Hours): 0.21 0.21 <br /> Return Time(Hours): 0.21 0.21 <br /> Loading Time(Hours): 0.60 NA <br /> Unloading Time(Hours): 0.60 NA <br /> Subtotals: 1.62 0.42 <br /> JOB TIME AND COST <br /> Total job time: 3.24 Hours <br /> Total job cost: $2,702 <br /> • <br /> CIRCES Cost Estimating Software <br />