Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization/Demobilization <br /> Site: Meadow Hollow Quarry Permit Action: 1/16/2020 Inspection Permit/Job#: M2009006 <br /> PROJECT IDENTIFICATION <br /> Task#: 006 State: Colorado Abbreviation: None <br /> Date: 1/27/2020 County: Larimer Filename: M006-006 <br /> User: AME <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $17.20 $29.63 $38.69 <br /> Operating Cost/Hour: $26.56 $47.02 $55.69 <br /> Operator Cost/Hour: $23.63 $23.63 $23.63 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $67.39 $123.81 $141.54 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat D8T-8SU 53.08 $114.29 $141.54 1 $255.83 $141.54 $250.00 <br /> Cat 637G - 57.28 $162.02- $141.54 1 - $303.56 $141.54 $250.00 <br /> Subtotals: $559.39 $283.08 $500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4x4,3/4 T. $12.96 1 $12.96 $12.96 <br /> Subtotals: $12.96 $12.96 <br /> CIRCES Cost Estimating Software <br />