My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-20_INSPECTION - M2009006
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2009006
>
2020-02-20_INSPECTION - M2009006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2020 1:43:08 PM
Creation date
2/20/2020 12:47:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009006
IBM Index Class Name
Inspection
Doc Date
2/20/2020
Doc Name
Returned Mail
From
DRMS
To
Colorado Quarry, LLC
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#004 Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 0.80 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 5680 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 NA (CAT HB) <br /> Job Efficiency: 0.830 NA (CAT HB) <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Rutted dirt,little maintenance,no water,2"tire penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (fpm) (min) <br /> 1 300.00 25.00 5.00 30.00 267 1.12 <br /> Haul Time: 1.12 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (fpm) (min) <br /> 1 300.00 -25.00 5.00 -20.00 1201 0.36 <br /> Return Time: 0.36 minutes <br /> Total Scraper team cycle time: 2.88 minutes <br /> Adjusted for job conditions: 501.46 LCY/Hour <br /> Selected Number of Scrapers: 1 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 501.46 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 501.46 LCY/Hour <br /> Unadjusted unit production/hour: 604.17 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 8.32 Hours <br /> Unit cost: $1.233 /LCY Total job cost: $5,147 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.