Laserfiche WebLink
Scraper Worksheet Cont'd Task#004 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Spread growth medium across 4.6 acres <br /> Site: Meadow Hollow Quarry Permit Action: 1/16/2020 Inspection Permit/Job#: M2009006 <br /> PROJECT IDENTIFICATION <br /> Task#: 004 State: Colorado Abbreviation: None <br /> Date: 1/27/2020 County: Larimer Filename: M006-004 <br /> User: AME <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 100 NA NA NA <br /> Ownership cost/hour: $162.02 NA $103.86 NA NA NA <br /> Operating cost/hour: $184.64 NA $82.26 NA NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA $0.00 NA NA NA <br /> Ripper op.cost/hour: NA NA $0.00 NA NA NA <br /> Operator cost/hour: $45.58 NA $39.98 NA NA NA <br /> Unit Subtotals: $392.24 NA $226.10 NA NA NA <br /> Number of Units: 1 0 .1 0 0 0 <br /> Group Subtotals: Work: $392.24 Support: $226.10 Maint: $0.00 <br /> Total work team cost/hour: $618.34 <br /> MATERIAL QUANTITIES <br /> Initial volume: 3,710 CCY Swell factor: 1.125 <br /> Loose volume: 4,174 LCY <br /> Source of estimated volume: 4.6 acres x 6 inch depth <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,650 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Decomposed rock-25%Rock, Heaped Volume: 34.00 LCY <br /> 75%Earth <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 30.79 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />