My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-13_HYDROLOGY - M2008082
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2020-02-13_HYDROLOGY - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:25:37 PM
Creation date
2/20/2020 7:49:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
2/13/2020
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ready Mix Concrete Substitute Water Supply Plan <br /> February 13, 2020 <br /> Page 2 of 10 <br /> Mining of the Morton-Holton Lakes site is presently expected to last up to fifteen years. <br /> The current mining plan for the site is shown in attached Figure 1. The replacement of <br /> depletions for Morton-Holton site is fully consumable water leased from the City of <br /> Aurora. <br /> Mining at Stage 1 was completed in July 2016. The exposed groundwater surface area <br /> within Stage 1 is currently 11 acres. Water will be delivered from Stage 1 to the river for <br /> maintenance of Stage 1 in February 2020, which will decrease the exposed groundwater <br /> surface area to 2 acres. It is expected that in March 2020 the pond will refill again <br /> resulting in 11 acres of exposed groundwater. <br /> Mining at Stage 2 was completed by the end of 2016. The exposed groundwater surface <br /> area within Stage 1 is currently 12.5 acres and is filled to a depth of 20 feet. RMCC plans <br /> to perform maintenance on Stage 2 and reduce the surface area of Stage 2 by 5.5 acres by <br /> March 2020 and then further reduce the surface area by another 2 acres in April 2020. <br /> Mining at Stage 6A was completed mid-2017. Stage 6A currently exposes a groundwater <br /> surface area of 0.1 acre and is expected to remain at 0.1 acre. <br /> Mining at Stage 6B was completed in March of 2018. Stage 6B currently exposes a ground <br /> water surface area of 2 acres and is expected to decrease slightly to a groundwater <br /> surface area of 1 acres in by July 2020. <br /> Mining at Stage 3 began in June 2017 and was completed in early 2018. Stage 3 was <br /> completely backfilled in the spring of 2019 with overburden from other stages. <br /> RMCC estimates that mining at Stage 4 will continue through the middle of 2020. A slurry <br /> wall was constructed around the Stage 4 and a 90-day leak test was approved on May 23, <br /> 2018. Stage 4 currently exposes 0.5 acre of ground water and is not expected to change <br /> for this SWSP period. <br /> Mining at Stage 6C/6D began in 2019 following the installation of the slurry wall. Stage <br /> 6C/6D currently exposes 0.5 acre of ground water and is expected to remain the same <br /> through this SWSP period <br /> A slurry was will be constructed for Stage 5 during this SWSP period. <br /> In accordance with the letter dated April 30, 2010 (copy attached) from the Colorado <br /> Division of Reclamation, Mining, and Safety ("DRMS"), all sand and gravel mining operators <br /> must comply with the requirements of the Colorado Reclamation Act and the Mineral Rules <br /> and Regulations for the protection of water resources. The April 30, 2010 letter from <br /> DRMS requires that you provide information to DRMS to demonstrate you can replace long <br /> term injurious stream depletions that result from mining related exposure of groundwater. <br /> The DRMS letter identified four approaches to satisfy this requirement. <br /> In accordance with approach nos. 1 and 3, you have indicated that a bond has been <br /> obtained for the new Morton-Holton Lakes site that can cover the cost of lining, to <br />