My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-13_HYDROLOGY - M2008082
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2020-02-13_HYDROLOGY - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:25:37 PM
Creation date
2/20/2020 7:49:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
2/13/2020
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C 0 L 0 R A D 0 <br /> AA Division of Water Resources <br /> TM Department of Natural Resources <br /> February 13, 2020 <br /> Ms. Jennifer S. Lindahl, P.E. <br /> Bishop-Brogden Associates, Inc. <br /> 333 West Hampden Avenue, Suite 1050 <br /> Englewood, Colorado 80110 <br /> Re: Ready Mixed Concrete Substitute Water Supply Plan (WDID 0202616) <br /> Morton-Holton Lakes Mine DRMS File No. M-2008-082 (WDID 0203053) <br /> Sections 1 and 12, T1 N, R67W of the 6th P.M. <br /> Sections 6 and 7, TIN. R66W of the 6th P.M. <br /> Water Division 1, Water District 2, Weld County <br /> SWSP ID: 5178 <br /> Approval Period: January 1, 2020 through December 31, 2020 <br /> Contact phone number for Ms. Lindahl: (303) 806-8952 <br /> Contact Email address for Ms. Lindahl: ilindahl@bbowater.com <br /> Dear Ms. Lindahl: <br /> We have reviewed your letter dated October 22, 2019 requesting renewal of the substitute <br /> water supply plan ("SWSP") to cover depletions at the Morton Lakes Mine ("Morton <br /> Lakes") and Holton Lake Mine ("Holton Lakes"), operated by Ready Mixed Concrete <br /> Company ("RMCC" or Applicant"). On March 6, 2017 the Colorado Division Mining and <br /> Safety ("DRMS") approved the incorporation of the Holton Lakes Mine into the Morton <br /> Lakes Mine, therefore both mining permits are now operating under Morton Lakes Mine <br /> (M-2008-082). <br /> The current SWSP amendment for the Morton-Holton Lakes was approved on December 3, <br /> 2018 to cover operations for January 1, 2019 through December 31, 2019. This SWSP will <br /> cover the estimated depletions from January 1, 2020 through December 31, 2020. The <br /> required fee of $257 for this SWSP has been submitted (receipt nos. 3694425). <br /> SWSP Operations <br /> The Morton-Holton Lakes Mine is located in the SE 1/4 of Section 1 and the NE1/4 of Section <br /> 12, all in Township 1 North, Range 67 West of the 6th P.M., and the SW 1/4 of Section 6, and <br /> the NW1/4 of Section 7, all in Township 1 North, Range 66 West of the 61h P.M. The <br /> depletions that result from the mining operation over the period of this SWSP include <br /> evaporation from exposed ground water, dust suppression, dewatering, water washed for <br /> the mined product, and additional fill. <br /> ti O� COl0 <br /> a n <br /> Room 92 1, Den?er, C 0-SCIC13" P 3 0 3.8,56.3 58 czlc ri-9do.gow lwater <br /> Jared S. l i , e Governor <br /> I Dori GiObs Lxecutive Drr ectcr kevi o G,Rein, St <br /> �� O <br /> AK <br /> NUM <br /> *1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.