Laserfiche WebLink
Page 2 of 18 <br /> Trapper TR124 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Backfill and Grading N Pit <br /> Site: Trapper Mine Permit Action: TR124 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: A001 State: Colorado Abbreviation: None <br /> Date: 2/10/2020 County: Moffat Filename: C010-A001 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: KOMATSU 830E <br /> -Loader: CAT 6090 <br /> Support Equipment-Load Area: Cat D10T- IOSU <br /> -Dump Area: Cat D10T- IOSU <br /> Road Maintenance-Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Tmck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Shovel Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 25 25 25 25 <br /> Ownership cost/hour: $193.78 $23.07 $140.61 $140.61 $82.71 $68.95 <br /> Operating cost/hour: $213.02 $930.15 $33.84 $33.84 $17.52 $25.83 <br /> %Utilization-riper: NA 0 15 NA NA NA <br /> Ripper own. cost/hour: NA $0.00 $20.29 $0.00 $0.00 $0.00 <br /> Ripper op. cost/hour: NA $0.00 $1.73 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $34.38 $37.27 $41.24 $41.24 $28.52 $21.09 <br /> Unit Subtotals: $441.17 $990.49 $217.42 $215.69 $128.75 $115.88 <br /> Number of Units: 16 4 1 1 1 1 <br /> Group Subtotals: Work: $11,020.68 Support: $433.11 Maine $244.63 <br /> Total work team cost/hour: $11,698.42 <br /> MATERIAL QUANTITIES <br /> Initial volume: 5,187,693 CCY Swell factor: 1.000 <br /> Loose volume: 5,187,693 LCY <br /> Source of estimated volume: TR124 Appendix A Table A-3.1 <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacitv: <br /> Truck Payload(weight)Basis: <br /> Material weight: 3,300 Pounds/LCY <br /> CIRCES Cost Estimating Software <br />