My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-11_PERMIT FILE - M2020002
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020002
>
2020-02-11_PERMIT FILE - M2020002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 1:01:14 PM
Creation date
2/11/2020 12:15:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020002
IBM Index Class Name
PERMIT FILE
Doc Date
2/11/2020
Doc Name
Adequacy Review Response
From
ARY Corp.
To
DRMS
Email Name
DC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D RECLAMATION PLAN <br /> 1. General Reclamation Plan <br /> The maximum disturbed area to be reclaimed under this permit is—20.0 acres out of the 30.0 <br /> acre permit area. Reclamation plans can be viewed on the Reclamation Map. Post-mining land <br /> use will return the entire disturbed site back to dry rangeland with native grasses on all slopes <br /> and is consistent with existing land use in the area. All areas of the site, including the mine <br /> area, stockpile area and hot plan area will be reclaimed to 3H:1V or shallower. As described <br /> in the mining plan, reclamation will occur concurrently with mining.No interior haul roads <br /> will remain following reclamation. All reclaimed areas will be sloped,topsoil replaced and <br /> seeded with the approved seed mix. <br /> 2. Topsoil Replacement <br /> Topsoil on site is anticipated to range from 0-3 inches thick. During mining, all topsoil will be <br /> stored in the site perimeter berm along the north, south,west, east borders of the site and are <br /> shown on the Reclamation Map. Topsoil will be replaced over the entire mine site in one event <br /> due to the small size of the site. Topsoil thickness upon replacement is expected to be 3 inches <br /> thick on average. <br /> 3. Haul Roads and Access <br /> Three access entrances and roads will connect the site to County Road T. Onsite haul roads will <br /> be flexible as mining moves throughout the site.No interior haul roads will remain following <br /> reclamation. <br /> 4. Reclamation Timetable <br /> See Exhibit E section 2. <br /> 5. Revegetation Plan <br /> For each area of reclamation, soil may be disked to loosen surficial soils. Due to the mild grade, <br /> seed can be drilled in most areas,but broadcast seeding will be utilized where reclaimed <br /> perimeter slopes do not allow drilling. The seed mix listed below will be used to revegetate the <br /> site with a native grass mix on all surfaces. This seed mix was recently reviewed and accepted in <br />
The URL can be used to link to this page
Your browser does not support the video tag.