Laserfiche WebLink
5. Schedule of Operations <br /> Mining, screening and processing will be conducted with portable equipment at various times of <br /> the year. Mining operations will be dictated by the project schedule. Mining may take place 6 <br /> days per week for the duration of the reconstruction project. The product will be hauled to the <br /> construction area nearly as fast as it is produced. <br /> 6. Lincoln County Impacts and Environmental Impacts <br /> The impacts to Lincoln County will be limited.No dust is expected from the operation as the pit <br /> and roads are watered as needed. In the event that airborne dust is observable, immediate action <br /> to mitigate dust via roadway wetting. Water used is purchased and brought on site and applied on <br /> an as-needed basis to control dust on haul roads and within the mine area. <br />