UK CONTINENTAL MATERIALS CORPORATION <br /> movement per day, and while these notices require action by CIVIC, they may not reach the magnitude <br /> of failure or imminent failure requiring a notice to DRMS. Following an alarm, additional inspections are <br /> performed, and decisions on notifications and continued work will be based on the results of the <br /> inspections and prism data. <br /> c. Map with locations of existing prism locations. <br /> Response: A map with existing prism locations has been included in Exhibit C.The map of prism <br /> locations will be updated and resubmitted to the Division at the start of reclamation activities and as <br /> prisms are installed during reclamation. <br /> 6.4.5 EXHIBIT E—Reclamation Plan <br /> 12.Topsoil Importation:The response requires additional clarification for the purpose of estimating the <br /> required reclamation bond. Page E-4, 3rd paragraph from SAR response and your Comment 12 <br /> response,there is an expectation to affect 139.1 acres. If all affected area is to be covered with 6 inches <br /> of topsoil, an estimated 112,207 CY of topsoil will be required for reclamation.Two topsoil stockpiles are <br /> identified on Exhibit C-1 totaling about 1.5 acres. Please provide the following: <br /> a. An estimated volume of available topsoil in each of these stockpiles and explain how any additional <br /> required topsoil/growth media will be obtained from both borrow and if applicable, offsite material. <br /> Response: Estimates of the existing stockpile volumes are in Exhibit E. Each stockpile is estimated to <br /> contain approximately 20,000 cubic yards of topsoil. Exhibit E also specifies that disturbing the <br /> additional 20 acres will provide approximately 16,000 cubic yards of topsoil.Topsoil from these areas <br /> will be removed and stockpiled,then used to reclaim the disturbed areas.There is a topsoil deficit of <br /> approximately 56,000 cubic yards, which will be imported, or a growth media generated onsite. <br /> b. If this volume involves the additional borrow area north of the shop area, please also state where the <br /> topsoil volume necessary for reclamation of this area will be obtained. <br /> Response: The volume calculations do not include any borrow areas outside the affected lands <br /> boundary.As discussed below and in Exhibit E,topsoil will be imported, or a growth media will be <br /> generated. <br /> c. If growth media is to be "manufactured", please provide a description of the organic/amendment <br /> material, where it will come from, and what onsite or imported material with which it will be mixed. <br /> Response: Exhibit E discusses how the growth media will be generated using fertilizer, wood chips, <br /> compost, or other available organic materials. Onsite soil will be used as the soil matrix and imported <br /> materials will be used to provide the organic content. Assuming an organic content of 3%, amending the <br /> Pikeview Quarry Amendment 4, Response to Adequacy <br /> February 7, 2020 <br /> 6 <br />