My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-07_REVISION - M1977211 (15)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2020-02-07_REVISION - M1977211 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 3:36:02 AM
Creation date
2/10/2020 8:31:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Revision
Doc Date
2/7/2020
Doc Name
Adequacy Review Response
From
Continental Materials Corp.
To
DRMS
Type & Sequence
AM4
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
emeCONTINENTAL MATERIALS CORPORATION <br /> Sampling should occur at the same time each year to maximize comparability between data sets <br /> (We would recommend within plus or minus two weeks of the same dates.) <br /> Photographic Documentation: <br /> "A color photograph oriented along the transect from the origin will be taken at each site. Color <br /> copies of these photographs will be attached to each annual report." CMC will maintain these <br /> reports at the Pikeview Quarry for inspection by the DRMS and the USFS until the permit is <br /> terminated. <br /> Noxious Weed Control Plan <br /> Weed control shall be employed for all prohibited noxious week species. Weed control shall also <br /> be utilized to thwart weedy species threatening the success of reclamation species or when <br /> weeds threaten to spread outside the permit boundary. Continental Materials Corp. will comply <br /> with the State of Colorado and El Paso County Noxious Weed Control regulations. <br /> Noxious Weed Monitoring Schedule: <br /> Noxious weed monitoring will occur in the months of April/May and again in the months of <br /> August/September. Noxious weed locations will be GPS located during the monitoring periods <br /> and again as part of the commercial treatment program. We will maintain a log and map as to <br /> noxious weed locations and dates and types of treatments. This record will be maintained on- <br /> site at the Company Office at the Pikeview Quarry for inspection by the DRMS and USFS until <br /> the site is released from reclamation liability and the permit terminated. <br /> Continental Materials Corp. will utilize the following mechanical and chemical methods to control <br /> noxious weeds: <br /> Field Mowing: <br /> Prior to noxious weeds reaching full maturity (producing flowers/going to seed), the weeds shall <br /> be mechanically mowed to a height of 4" to 6" where such activity will not pose a hazard to <br /> equipment or equipment operators. This should be performed twice during the growing season <br /> in late spring and late summer. Additional mowing will be performed as necessary. <br /> Chemical Control: <br /> One initial application of an appropriate selective herbicide shall be applied, per manufactures <br /> recommendations, or by a certified applicator for control of noxious weeds. Application shall be <br /> done during the growth stage and when temperatures and other conditions are appropriate to <br /> achieve the most effective control. Follow-up applications will be done as needed. In areas where <br /> Pikeview Quarry Amendment 4 <br /> E-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.