Laserfiche WebLink
1100318 R0T0 0811 JRW1 15 <br />Therefore, as with the Original Permit Application, Restated Permit Application, and 1994 <br />Amendment for Pikeview Quarry, the 2000 Amendment contain the results of engineering <br />evaluations, designs, and peer reviews of designs for further development, extraction, and <br />reclamation of the quarry. Based on the available documentation, these designs were <br />substantively implemented at Pikeview Quarry except as modified by subsequent approved <br />documents such as technical revisions. <br />3.4 Technical Revision 11 (TR-11) <br />Technical Revision 11 was submitted on July 24, 200141 and approved on August 31, 2001.42 <br />The scope of TR-11 is to “deepen the excavation of the bottom lift in the South Pit from the <br />currently approved 30 foot depth to 70 feet deep. Plus, increase the overall angle of the cut <br />slope from 48 degrees to 53 degrees.”43 As with the previously discussed permit application <br />and amendments, TR-11 was based upon an engineering evaluation. The evaluation was <br />performed by Dr. Abel who summarized his findings in a report dated June 21, 2001.44 Based <br />on the available documentation, these designs were substantively implemented at Pikeview <br />Quarry. <br /> <br /> <br />39 State of Colorado, Division of Minerals and Geology, Adequacy Review, Pikeview Quarry Amendment No. 3, <br />File No. M-1977-211, February 9, 2001 (Appendix 32) <br />40 Banks and Gesso, LLC, Response to Second Adequacy Review, Pikeview Quarry DMG File No. M-1977-211, <br />Amendment 003, February 23, 2001 (Appendix 33) <br />41 Banks and Gesso, LLC, Technical Revision to Pikeview Quarry, File No. M-77-211, July 24, 2001 <br />(Appendix 18) <br />42 State of Colorado, Division of Minerals and Geology, Pikeview Quarry, Technical Revision Approval, Permit <br />No. M-1977-211, Revision No. TR-11, August 31, 2001 (Appendix 19) <br />43 State of Colorado, Division of Minerals and Geology, Pikeview Quarry, Technical Revision Approval, Permit <br />No. M-1977-211, Revision No. TR-11, August 31, 2001 (Appendix 19) <br />44 John F. Abel, Jr., South Pit Deepening Plan, Pikeview Quarry, June 21, 2001 (Appendix 34)