My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-07_REVISION - M1993041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993041
>
2020-02-07_REVISION - M1993041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:06:49 PM
Creation date
2/7/2020 11:45:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993041
IBM Index Class Name
Revision
Doc Date
2/7/2020
Doc Name
Request for Technical Revision
From
CEMEX, Inc.
To
Dowe Flats Quarry
Type & Sequence
TR4
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.rpocd lw - ewa(V <br /> TR04 <br /> OF CO[O <br /> COLORADO DIVISII AME/mac iTION, MINING AND SAFETY <br /> *„7* 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 kkGOV__ <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET FEB 0 7 ZO22S0 <br /> 1993-041 Dowe Flats QuarryDAM ON OFRECLWtiIONN <br /> File No.. M- Site Name. MINING AND SAFETY <br /> County Boulder TR# (DRMS Use only) <br /> Permittee: CE M EX, Inc. 0 0 3 <br /> 3 <br /> O " j <br /> Operator(If Other than Permittee): ET <br /> Cita Cisse b <br /> Permittee Representative: � A <br /> Please provide a brief description of the proposed revision: <br /> Changes to the approved mining and reclamation plans and maps. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or o <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted ;o <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, 9.I� <br /> the Division may require the submittal of a permit amendment to make the required or desired changes ' �p <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.