Laserfiche WebLink
Please refer to the Reclamation Plan Map for the list of plant materials and seeds to be <br /> utilized. The operator will seed during the appropriate season to ensure adequate <br /> moisture for germination and implement weed controls to allow the grasses to successfully <br /> establish. Additional plantings may be installed once the reservoirs are full of water and <br /> the grasses are established. <br /> iii. Fertilization-types,mixtures, quantities, and time of application, <br /> The type and application rate of fertilizer shall be determined based on a soil test at the <br /> time of final reclamation. <br /> iv. Re vegetation-types of trees, shrubs, etc.;and <br /> Please refer to the Reclamation and Landscape Plan Maps for the types, quantities and <br /> location of trees and shrubs to be planted. <br /> v. Topsoiling-specify anticipated minimum depth or range of depths for those areas <br /> where topsoil will be replaced. <br /> Topsoil will be uniformly placed and spread on all areas disturbed by the mining above the <br /> anticipated high water line. The minimum thickness shall be 6 inches above the <br /> surrounding finished grade. <br /> WEED MANAGEMENT PLAN <br /> Bestway Concrete&Aggregates has a full-time weed manager on staff. This person is responsible <br /> for monitoring and controlling noxious weeds as they appear. Bestway Concrete typically prefers <br /> to control weeds mechanically, by mowing and/or discing. If necessary, weeds will be killed with a <br /> contact herbicide. Bestway Concrete has all of the necessary equipment in house to perform these <br /> tasks. <br /> Bestway Concrete&Aggregates—Vogl Amendment-Shores Mine—MLRB 112 Permit Application <br /> Exhibit E-5 <br />