Laserfiche WebLink
manner that controls erosion and siltation of the affected land and protects areas outside <br /> the affected land from slides and other damage. In addition, backfilling and grading shall <br /> be completed as soon as feasible after the mining process. <br /> Final grading will create a final topography that is appropriate for the final land use. For <br /> example, grades on the site will be returned to existing (pre-mining)grade. Topsoil will be <br /> uniformly placed and spread on areas disturbed by the mining. The minimum thickness <br /> shall be 6 inches above the surrounding finished grade, consistent with existing topsoil <br /> depths on-site. The topsoil shall be keyed to the underlying and surrounding material by <br /> the use of harrows, rollers or other equipment suitable for the purpose. <br /> In those areas where revegetation is part of the reclamation plan, the Operator will <br /> revegetate the land in such a manner so as to establish a diverse, effective, and long- <br /> lasting vegetative cover that is capable of self-regeneration without continued dependence <br /> on irrigation or fertilizer and is at least equal in extent of cover to the natural vegetation of <br /> the surrounding area. Seed will be drilled and mulched. <br /> The revegetation seeding and plant list on the Reclamation Plan Map contains the <br /> preferred species of grasses, shrubs and trees to be planted. <br /> Seeding will take place once final grading and replacement of topsoil have been <br /> completed. Timing of seeding will be consistent with standard horticultural practice for <br /> dryland applications-generally between late September and the middle of April to ensure <br /> there is adequate moisture for germination. <br /> (e) A plan or schedule indicating how and when reclamation will be implemented. <br /> Include. <br /> i. An estimate of the periods of time which will be required for the various stages or <br /> phases of reclamation. <br /> Please refer to the Timetable for Mining and Reclamation in Section (e)of Exhibit D. <br /> ii. A description of the size and location of each area to be reclaimed during each <br /> phase. <br /> Please refer to the Reclamation Plan Map (Exhibit F). <br /> iii. Outlining the sequence in which each stage or phase of reclamation will be carried <br /> out. <br /> Please refer to the Timetable for Mining and Reclamation in Section (e) of Exhibit D. <br /> (� A description of <br /> i. Final grading-maximum anticipated slope gradient or expected ranges thereof,• <br /> The finished slopes of the reservoir will be 3 horizontal to 1 vertical. Any area reclaimed to <br /> native grade will match natural topography. <br /> ii. Seeding-types,mixtures, quantities and time of application, <br /> Bestway Concrete&Aggregates—Vogl Amendment-Shores Mine—MLRB 112 Permit Application <br /> Exhibit E-4 <br />