My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-30_REPORT - C1982056
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2020-01-30_REPORT - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:00:43 PM
Creation date
2/3/2020 10:01:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
1/30/2020
Doc Name
Annual Hydrology Report Adequacy Review
From
DRMS
To
Twentymile Coal, LLC
Annual Report Year
2018
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sandstone),008-77-58(Wadge overburden),008-AU3 (Fish Creek <br /> alluvium),008-AT-1(Trout Creek alluvium),and 008-AV-2 (Foidel <br /> Creek alluvium.) The mine's annual hydrology reports contain <br /> long-term data from these wells. The Division compared the water <br /> quantity and quality data collected in 2018 to the maximum, <br /> minimum and average levels reported for each monitoring site and <br /> the Table 3 numeric standards for ground water for agricultural <br /> use. See item no. 17 for the results of the Division's review. <br /> The ground water point of compliance well for the Trout Creek <br /> alluvium,008-AT-1,was identified as being destroyed in November <br /> of 2012. As such, no data has been collected for the Trout Creek <br /> alluvium since April of 2012. A determination of compliance since <br /> April 2012 cannot be made due to a failure to collect and submit <br /> the required data. Site 008-AT-1 was re-established in the <br /> summer of 2014 and monthly water monitoring has been ongoing <br /> since the re-establishment of the well. <br /> Surface water monitoring approved plan is contained in Exhibit 14- <br /> 7 through 14-9. Table A Lists the sites and frequency with <br /> different requirements depending on month. <br /> • Exhibit 14(Ex 14-11)Table B, lists Cadmium(total <br /> recoverable)as a required parameter in Surface water, <br /> spoil springs, natural springs,and mine discharge. This <br /> parameter does not appear in the water quality data. <br /> Please ensure the correct parameters are being <br /> measured. <br /> Foidel Creek: 4 sites include; site 800 upstream,site 14 upstream, <br /> site 8 downstream of pond G, and site 900 downstream before <br /> at Sampling frequency Middle Creek confluence. Site 304 was removed with TR 42 in <br /> at surface water sites, Exhibit 14 of CDRMS mining Springs and Mine permitC-1982-056 2003. <br /> Discharge. Site 90OA: <br /> • Listed in current permit Table A approved 9/17/2015 <br /> • This site was monitored by the operator during the <br /> observed sampling event in July 2019, however data from <br /> this site is not in the AHR. <br /> • Per permit page 2.06-25.9 site 900A will be monitored for <br /> at least one year prior to any mining related impacts to <br /> site 900,which is within 4RT longwall panel of the WCR. <br /> The approved mine plan currently has this area scheduled <br /> to be disturbed at some point in 2021. Monitoring at this <br /> site should begin in 2020 and data reported in the AHR. <br /> Fish Creek: 9 sites include; 16A upstream of Fish Creek Borehole <br /> and site 115,307 downstream of FCB,302 2 miles downstream of <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.