Laserfiche WebLink
Rifle Gravel Pit #1 January 2020 <br /> 1.4 Commodity to be Mined <br /> Approximately 3 Million tons of sand and gravel will be mined from the property to provide <br /> materials for future projects. The projected duration of the commercial mining activities is 5 <br /> to 7 years. <br /> 1.5 Legal Description of Project Area and Access Road <br /> The legal description of the project area and latitude and longitude of the access road are <br /> provided in Section 2.0. <br /> 2 <br />