My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-31_PERMIT FILE - M2020008
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020008
>
2020-01-31_PERMIT FILE - M2020008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 8:00:08 AM
Creation date
1/31/2020 12:17:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020008
IBM Index Class Name
PERMIT FILE
Doc Date
1/31/2020
Doc Name
Application
From
Scott Contracting Inc.
To
DRMS
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit #1 January 2020 <br /> 1 .0 General Operation Information <br /> Scott Contracting, Inc. (SCI) is applying for a Division of Reclamation, Mining and Safety <br /> (DRMS) Construction Material, Regular (112) Operation Reclamation Permit for the Rifle <br /> Gravel Pit #1. The Rifle Gravel Pit #1 is located approximately 1-mile northeast of Rifle, <br /> Colorado. <br /> 1.1 Applicant/Operator <br /> Scott Contracting, Inc. (SCI) <br /> Tony Roberts <br /> 9200 Mineral Avenue, Suite 400 <br /> Centennial, Colorado 80112 <br /> troberts@scottcontracting.com <br /> 1.2 Operation Name (pit, mine or site name) <br /> Rifle Gravel Pit #1 <br /> 1.3 Permitted Acreage <br /> 1.3.1 Existing DRMS 111 Permit <br /> N/A <br /> 1.3.2 New DRMS 112 Permit <br /> 58.7 acres <br /> 1.3.2.1 Planned Excavation Area <br /> 58.7 acres <br /> 1.3.2.2 Planned Material Storage Area <br /> (Maximum) 0.72 acres; assumed approximately 19,400 CY at 2:1 side slope <br /> 1.3.2.3 Planned Topsoil Storage Area <br /> 2.6 acres (assumed 1 foot of topsoil material cut, approximately 131,000 CY, stored in a <br /> cone with 2:1 side slopes). Note this reflects the material for the entire site, for all mining <br /> phases. The project will be phased, therefore the topsoil storage area will most likely be <br /> smaller (-0.76 acres per stage). <br /> 1.3.2.4 Total Permit Area <br /> 58.7 acres <br /> 1.3.2.5 Total Parcel Size <br /> 58.7 acres <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.