Laserfiche WebLink
Page 58 of 135 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Topsoil to Morgan Storage Area via County Road <br />Site: New Horizon Mine Permit Action: RN7 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 45C State: Colorado <br />Date: 12/28/2017 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Descrition <br />Truck Loader Team -Truck: I Generic 15-18 c , 6x4 <br />-Loader: CAT 988H <br />Support Equipment -Load Area: NA <br />-Dump Area: Cat D8T - 8SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 2,500 Gal. <br />Abbreviation: None <br />Filename: C008 -45C <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eouinment <br />Total work team cost/hour: $949.76 <br />MATERIAL OUANTITIES <br />Initial volume: 9,470 CCY Swell factor: 1.215 <br />Loose volume: 11,506 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />75 <br />NA <br />100 <br />100 <br />100 <br />Ownership cost/hour: <br />$26.62 <br />$83.38 <br />NA <br />$83.81 <br />$54.68 <br />$7.88 <br />Operating cost/hour: <br />$47.82 <br />$60.92 <br />NA <br />$66.17 <br />$46.99 <br />$14.74 <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$30.37 <br />$41.20 <br />NA <br />$41.85 <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$104.81 <br />$185.50 <br />NA <br />$191.83 <br />$130.57 <br />$22.62 <br />Number of Units: <br />4 <br />1 <br />0 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$604.74 <br />Support: <br />$191.83 <br />Maint: <br />$153.19 <br />Total work team cost/hour: $949.76 <br />MATERIAL OUANTITIES <br />Initial volume: 9,470 CCY Swell factor: 1.215 <br />Loose volume: 11,506 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />