Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.60 Minutes <br />0.70 Minutes <br />Scraper Push Dozer Source <br />Altitude Ad': 1.000 1.000 CAT HB <br />Job Efficiencv: 0.830 0.830 (CAT HB) <br />Page 57 of 135 <br />Site Altitude: 5700 feet <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route - <br />Seg # <br />Haul Distance (Ft) Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity <br />00m) <br />Travel Time <br />(nun) <br />1 <br />2400.00 1.04 <br />5.00 <br />6.04 <br />1069 <br />2.29 <br />Haul Time: 2.29 minutes <br />Rehim Rn te- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />2400.00 <br />-1.04 <br />5.00 <br />3.96 <br />2744 <br />1.12 <br />Return Time: <br />1.12 <br />minutes <br />Total Scraper team cycle time: <br />4.71 <br />minutes <br />Adjusted for job conditions: <br />306.62 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />613.25 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,226.50 <br />LCY/Hour <br />Unadjusted unit production/hour: 369.43 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: <br />4.34 Hours <br />Unit cost: $1.272 /LCY Total job cost: $6,776 <br />CIRCES Cost Estimating Software <br />