My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-28_INSPECTION - C1981010
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981010
>
2020-01-28_INSPECTION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:54:44 PM
Creation date
1/29/2020 7:52:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Inspection
Doc Date
1/28/2020
Doc Name
Inspection Report
From
DRMS
To
Trapper Mining Inc
Inspection Date
1/23/2020
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 January 2020 C-1981-010/Trapper Mine RAR <br /> SUPPORT FACILITIES—Rule 4.04 <br /> o The Ready Line appeared orderly at the time of inspection. <br /> o The Ash Pit exhibited a compacted and smooth surface,free of ruts and low areas. A number of <br /> benches are being utilized. <br /> HYDROLOGIC BALANCE—Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Silty ation Structures 4.05.5, 4.05.6;Discharge Structures <br /> 4.05.7, 4.05.10;Diversions 4.05.4;Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Drainage- <br /> Acid and Toxic Materials 4.05.8;Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18 <br /> The observable pond systems comprised No Name,Johnson,Pyeatt,Middle and East Flume Systems, and <br /> Oak. All ponds were frozen and snow covered. Access roads to the ponds were inaccessible due to snow <br /> cover. <br /> o Middle Pyeatt ponds are dry <br /> o East Pyeatt ponds holding water. Lower was discharging at the last sampling date. <br /> BACKFILL and GRADING—RULE 4.14 <br /> o Backfilling and grading operations have halted for the winter. <br /> o Spoil was being transported and deposited where Backfilling and grading operations will <br /> commence in the spring. <br /> DOCUMENTS RECEIVED <br /> None <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.