Laserfiche WebLink
COLORADO DI` MATION MINING AND SAFETY <br /> 01 1876 1313 Sherman St lorado 80203 ph(303)866-3567 <br /> DMClthm <br /> REQUEST FOR ThtjifNIC;AL REVISION (TR) COVER SHEET <br /> File No.: M- 2016-084 site Name:Sacramento Access Tunnel <br /> County Gunnison TR# Use onW <br /> Permittee:CRG Mining, LLC RECEIVED <br /> Operator(If Other than Permittee):Same P JAN 21 2020 <br /> Jake Wilkinson % DMSIONOFRECLAMATION <br /> Permittee Representative: <br /> Please provide a brief description of the proposed revision: <br /> Operator proposes to increase the dimensions of the planned Sacramento Tunnel,which is not yet constructed,to <br /> accommodate larger equipment. The current plan is for an 8 ft x 8 ft tunnel,and we wish to make it 12 ft x 12 ft. No other <br /> o 0 <br /> 0 <br /> 3 c <br /> o 'fl N <br /> Ey <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application o b <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or N CP <br /> 46 <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will c <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a °I,-p <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 11 Oc, 111, 112 construction <br /> materials, and 112 quarries $216 J <br /> 112 hard rock (not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />