Laserfiche WebLink
Mobilization Worksheet Cont'd Task#003 Page 2 of 2 <br /> EOUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: COLORADO SPRINGS <br /> Total one-way travel distance: 107.00 miles <br /> Average Travel Speed: 60.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $0.00 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $320.07 <br /> **one round trip,no haul rig: <br /> Tranaportation CycleTime: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 1.78 1.78 <br /> Return Time(Hours): 1.78 1.78 <br /> Loading Time(Hours): 0.15 NA <br /> Unloading Time(Hours): 0.15 NA <br /> Subtotals: 3.87 3.57 <br /> JOB TIME AND COST <br /> Total job time: 3.57 Hours <br /> Total job cost: $320 <br /> CIRCES Cost Estimating Software <br />