Laserfiche WebLink
Pagel of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob/Demob <br /> Site: Robert Michael#1-A Permit Action: New I10(1) Permit/Job#: M-2019050 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 12/27/2019 County: Park Filename: M050-003 <br /> User: ERR <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP QM HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $17.20 $29.63 $38.69 <br /> Operating Cost/Hour: $26.56 $47.02 $55.69 <br /> Operator Cost/Hour: $23.63 $23.63 $23.63 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $67.39 $123.81 $141.54 <br /> NON ROADABLE EOUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Subtotals: I $0.00--T $0.00 I $0.00 <br /> ROADABLE EOUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet COSt/hr/fleet <br /> Light Duty Pickup,4x4, 1 T. $89.74 1 $89.74 $89.74 <br /> Crew <br /> Subtotals: $89.74 $89.74 <br /> CIRCES Cost Estimating Software <br />