My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-10_PERMIT FILE - C1981019A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-12-10_PERMIT FILE - C1981019A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 5:33:08 PM
Creation date
1/15/2020 7:10:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
12/10/2019
Section_Exhibit Name
Table of Contents
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 4.05.3 DIVERS/ONS AND CONVEYANCE OF OVERLAND FLOW AND SHALLOW GROUNDWATER FLOW AND <br /> EPHEMERAL STREAMS DRAINING xWATERSHED LESS THAN ONE SQUARE MILE.....................................................9 <br /> 4.05.4 STREAM CHANNEL DIVERSIONS(RELOCATION orSTREAMS)..................................................................9 <br /> 4.05.5 SEDIMENT CONTROL MEASURES............................................................................................................l0 <br /> 4.056 SEDIMENTATION PONDS.........................................................................................................................l0 <br /> 4.05.7 DISCHARGE STRUCTURES.......................................................................................................................l2 <br /> 4.05.8 ACID-FORMING AND Toxic-FORMING SPOIL..........................................................................................l3 <br /> 4.059 PERMANENT AND TEMPORARY IMPOUNDMENTS----------------------------l3 <br /> 4.O5.lOUNDERGROUND MINE ENTRY AND ACCESS DISCHARGES..........................................................................)5 <br /> 4.O5]lGROUND WATER PROTECTION................................................................................................................... 5 <br /> 4.O5J2PROTECTION o,GROUNDWATER RECHARGE CAPACITY............................................................................l5 <br /> 4.O5]3SURFACE AND GROUNDWATER MONITORING.............................................................................................l8 <br /> 4.05J4TRANSFER npWELLS.................................................................................................................................23 <br /> 4.Oil5WATER RIGHTS AND REPLACEMENT..........................................................................................................2] <br /> 4.Oil6DISCHARGE orWATER INTO xmUNDERGROUND MINE.............................................................................23 <br /> 4.05.17 POST-MINING AND REHABILITATION OF SEDIMENTATION PONDS,DIVERSIONS,IMPOUNDMENTS,AND <br /> TREATMENTFACILITIES........................................................................................................................................... 4 <br /> 4.05]8 STREAM BUFFER ZONES......................................................................................................................... 4 <br /> 4'06 TOPSOIL..........................................................................................................................................................%7 <br /> 4.06J GENERAL REQUIREMENTS......................................................................................................................27 <br /> 4.062 REMOVAL...............................................................................................................................................27 <br /> 4.06.3 STORAGE................................................................................................................................................28 <br /> 4.06.4 REDISTRIBUTION--------------------------------------------29 <br /> 4.06.5 RECONDITIONING-------------------------------------------'29 <br /> 4.07 SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS <br /> 4.07.1 GENERAL REQUIREMENT 30 <br /> ---------------------------------------- <br /> 4.072 TEMPORARY SEALING............................................................................................................................30 <br /> 4.07.3 PemmxmnmrSEAumo-----------------------------------------]O <br /> 4.07.4 ABANDONMENT rwDESIGNATED GROUNDWATER BASINS.....................................................................30 <br /> 4.00 USE OF EXPLOSIVES...............................................................................................................................30 <br /> 3O <br /> 4.08.1 GENERAL RE0umsMemTo---------------------------------------. <br /> 4.082 PRE-BLASTING SURVEY......................................................................................................................... l <br /> 4.08.3 PUBLIC NOTICE orBLASTING SCHEDULE...............................................................................................32 <br /> 32 <br /> 4.08.4 SompCEBLxoowoREQUIREMENTS---------------------------------- <br /> 4.08.5 RECORDS orSURFACE BLASTING ACTIVITIES -----------------------------34 <br /> 4.086 SEISMOGRAPHIC MEASUREMENTS-----------------------------------.34 <br /> 4.09 DISPOSAL OF EXCESS SPOIL AND UNDERGROUND DEVELOPMENT FILL WASTE............35 <br /> 4'10 COAL PROCESSING WASTE BANKS....................................................................................................3* <br /> 4.11 COAL PROCESSING WASTE..................................................................................................................37 <br /> 4]1.1 BURNING................................................................................................................................................37 <br /> 4J12 BURNED WASTE UTILIZATION................................................................................................................37 <br /> 4]1.3 RETURN roUNDERGROUND WORKINGS................................................................................................37 <br /> 4J1/4 DISPOSAL opNumCoxLWASTE.............................................................................................................37 <br /> 4]1.5 DAMS AND EMBANKMENTS....................................................................................................................38 <br /> 4L12 SLIDES AND OTHER DAMAGE <br /> 4'13 CONTEMPORANEOUS RECLAMATION.............................................................................................41 <br /> 4'14 BACKFILLING AND GRADING..............................................................................................................4l <br /> 4.14.1 GENERAL REQUIREMENTS......................................................................................................................4l <br /> 4]42 GENERAL GRADING REQUIREMENTS......................................................................................................45 <br /> Table nfContents Date Revised: ll/25/lq <br /> Revision No: MR-2ll <br />
The URL can be used to link to this page
Your browser does not support the video tag.