My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-10_PERMIT FILE - C1981019A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-12-10_PERMIT FILE - C1981019A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 5:33:08 PM
Creation date
1/15/2020 7:10:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
12/10/2019
Section_Exhibit Name
Table of Contents
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES- <br /> MINIMUM REQUIREMENTS FOR OPERATIONS AND RECLAMATION PLAN.......................................1 <br /> 2.05.1 OBJECTIVES..............................................................................................................................................1 <br /> 2.05.2 OPERATION PLAN-ESTIMATED AREA FOR LIFE OF OPERATION..............................................................1 <br /> 2.05.3 OPERATION PLAN-PERMIT AREA PRODUCTION METHODS AND EQUIPMENT.........................................1 <br /> 2.05.4 RECLAMATION PLAN..............................................................................................................................19 <br /> 2.05.5 POST-MINING LAND USES......................................................................................................................41 <br /> 2.05.6 MITIGATION OF SURFACE MINING OPERATION IMPACTS.......................................................................43 <br /> 2.06 REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES......................................................1 <br /> 2.06.1 SCOPE.......................................................................................................................................................1 <br /> 2.06.2 EXPERIMENTAL PRACTICES MINING........................................................................................................1 <br /> 2.06.3 MOUNTAINTOP REMOVAL MINING...........................................................................................................1 <br /> 2.06.4 STEEP SLOPE MINING...............................................................................................................................1 <br /> 2.06.5 PERMITS INCORPORATING VARIANCES FROM APPROXIMATE ORIGINAL CONTOUR RESTORATION <br /> REQUIREMENTS FOR STEEP SLOPE MINING...............................................................................................................1 <br /> 2.06.6 PRIME FARMLANDS..................................................................................................................................1 <br /> 2.06.7 VARIANCES FOR DELAY IN CONTEMPRANEOUS RECLAMATION REQUIREMENTS IN COMBINED SURFACE <br /> AND UNDERGROUND MINING OPERATIONS...............................................................................................................1 <br /> 2.06.8 SURFACE COAL MINING AND RECLAMATION OPERATIONS ON AREAS OR ADJACENT TO AREAS <br /> INCLUDING ALLUVIAL VALLEY FLOORS...................................................................................................................2 <br /> 2.06.9 AUGERING AND HIGHWALL MINING........................................................................................................5 <br /> 2.06.10 COAL PROCESSING PLANS AND SUPPORT FACILITIES NOT LOCATED WITHIN THE PERMIT AREA............6 <br /> 2.06.1 1 IN-SITU PROCESSING ACTIVITY...............................................................................................................6 <br /> RULE 2 MISCELLANEOUS REQUIREMENTS...................................................................................................1 <br /> 2.07 PUBLIC PARTICIPATION AND APPROVAL OF PERMIT APPLICATIONS........................................1 <br /> 2.08 PERMIT REVIEWS,REVISIONS AND RENEWALS,AND TRANSFER,SALE AND ASSIGNMENT <br /> 2.10 MAPS AND PLANS-GENERAL REQUIREMENTS...................................................................................1 <br /> RULE 3 PERFORMANCE BOND REQUIREMENTS..........................................................................................1 <br /> RULE 4 PERFORMANCE STANDARDS...............................................................................................................1 <br /> 4.01 GENERAL PROVISIONS.......................................................................................................................................1 <br /> 4.01.1 SCOPE AND OBJECTIVES..................................................................................................................................1 <br /> 4.02 SIGNS AND MARKERS...............................................................................................................................1 <br /> 4.02.1 SPECIFICATIONS.......................................................................................................................................1 <br /> 4.02.2 MINE AND PERMIT IDENTIFICATION SIGNS...............................................................................................1 <br /> 4.02.3 PERIMETER MARKERS..............................................................................................................................1 <br /> 4.02.4 DURATION OF MAINTENANCE..................................................................................................................2 <br /> 4.02.5 STREAM BUFFER ZONE MARKERS............................................................................................................2 <br /> 4.02.6 BLASTING SIGNS......................................................................................................................................2 <br /> 4.02.7 TOPSOIL MARKERS..................................................................................................................................2 <br /> 4.03 ROADS............................................................................................................................................................2 <br /> 4.03.1 HAUL ROADS ...........................................................................................................................................2 <br /> 4.03.2 ACCESS ROADS........................................................................................................................................5 <br /> 4.03.3 LIGHT-USE ROADS...................................................................................................................................5 <br /> 4.04 SUPPORT FACILITIES...............................................................................................................................6 <br /> 4.05 HYDROLOGIC BALANCE.........................................................................................................................7 <br /> _ 4.05.1 GENERAL REQUIREMENTS........................................................................................................................7 <br /> 4.05.2 WATER QUALITY STANDARDS AND EFFLUENT LIMITATIONS...................................................................8 <br /> Table of Contents ii Date Revised: 11/20/19 <br /> Revision No: TR-134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.