Laserfiche WebLink
Page (2 <br />• Appendix W. Section XVI. As -built certifications for Deacon, Deal and Jeffway ponds. <br />• Appendix W. Section XXXVIII. As -built Information for Deacon Gulch Ponds #1 and #2. <br />• Appendix W. Section XXXIX. As -built Information for Deal Gulch Pond #2. <br />• Appendix W. Section XXXX. As -built Information for Jeffway Gulch Pond #1. <br />The following revised maps are enclosed: <br />• M9. Sheet 2 of this three set Haulroads Map is updated. <br />• M l OA. Sheet 2 of this three set Mining and Regrade Map is updated. <br />• M1OB. Sheet 2 of this three set Topsoil Stripping and Reclaim Map is updated. <br />• M12. Sheet 2 of this three set Postmining Topography Map is updated. <br />• M14. This Drainage Profiles Map is updated in line with changes to Map M12. <br />• M14A. N Pit Pre and post -mining profiles are updated in line with changes to Map M12. <br />Please get back to us with any questions, comments or concerns. <br />Sincerely, <br />Forrest Luke <br />Environmental Manager <br />Trapper Mining Inc. <br />c Revisions binder <br />File 109.2.3.4 <br />