My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-09_REVISION - M1977211
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2020-01-09_REVISION - M1977211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:29 PM
Creation date
1/9/2020 1:17:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Revision
Doc Date
1/9/2020
Doc Name
Adequacy Review Response #2
From
Continental Materials Corporation
To
DRMS
Type & Sequence
AM4
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cmcCONTINENTAL MATERIALS CORPORATION <br /> our original comment requested frequency criteria for both monitoring and reporting. Please commit to <br /> all three types of monitoring and provide a frequency for each type of monitoring and commit to <br /> reporting monitoring results to the DRMS quarterly for the first year. The DRMS will determine after the <br /> first year of monitoring if the reporting frequency can be reduced. <br /> Response: The text in Exhibit D has been revised to include monitoring using drones and reporting. <br /> 6.4.5 EXHIBIT E—Reclamation Plan <br /> 12.Topsoil Importation:The DRMS accepts your commitment to import and stockpile the additional <br /> 57,000 CY of growth media in 2020 for final reclamation. Please be aware the DRMS will need to hold a <br /> bond for the importation of this growth media until a sufficient quantity is stockpiled on site. <br /> The response requires additional clarification on the topsoil volume necessary for reclamation. Based on <br /> the DRMS December 5, 2019 site inspection and a subsequent meeting with Pikeview personnel in <br /> Denver on December 13, 2019,The DRMS understands additional area just north of the maintenance <br /> shop and within the permit boundary is to be affected area. Will the new area be net neutral for topsoil <br /> needs (i.e., will topsoil be stripped from this area prior to excavating borrow material, then replacing the <br /> stripped topsoil) or will additional growth media need to be imported? <br /> Response: Exhibit E has been revised with updated topsoil volumes.Topsoil from the increased <br /> disturbance area will be salvaged and used for reclamation. The reclamation plan requires 56,000 cubic <br /> yards of topsoil/growth media, which are currently not available onsite. Castle has included costs in <br /> Exhibit L for mixing mulch with soil onsite to create the growth media. <br /> 6.4.6 EXHIBIT F—Reclamation Plan Map <br /> 15. Revegetation:The response requires an update. Based on the DRMS December 5, 2019 site <br /> inspection and a subsequent meeting with Pikeview personnel in Denver on December 13, 2019,The <br /> DRMS understands additional area just north of the maintenance shop and within the permit boundary <br /> is to be affected area. Please update and resubmit Exhibit L, Worksheets No. 3 and No. 14A accordingly. <br /> Response: See response to comment 6. Exhibit L has been revised to include the revised borrow <br /> volumes and disturbance area. <br /> 6.4.6 EXHIBIT G—Water Information <br /> 17. Drainage Features: The response requires additional clarification. Some of the various drainage <br /> features discussed in Exhibit G were not identified on the revised Exhibit G-1. Please address comments <br /> 17b and 17c: <br /> Response: The comment requested additional information on item 17c, but we assume this meant 17e. <br /> Pikeview Quarry Amendment 4, Response to Adequacy <br /> January 7, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.