CmcCONTINENTAL MATERIALS CORPORATION <br /> Application <br /> 1. Applicant/operator company name.The DRMS is reviewing your response.Additional information <br /> may be required. <br /> Response: To clarify the applicant/operator name and to be consistent with the previous amendment, <br /> the applicant name has been revised to be Continental Materials Corporation. The permit application <br /> form and figures have been updated with the following information: <br /> Continental Materials Corporation <br /> 440 South LaSalle, Suite 3100 <br /> Chicago, IL 60605-5020 <br /> Phone: 312-541-7200 <br /> 6.4.3 EXHIBIT C-Pre-mining and Mining Plan Map(s)of Affected Lands <br /> 6. Exhibits C-1 and C-2 Involved Area: The response requires an update. Based on the DRMS December <br /> 5, 2019 site inspection and a subsequent meeting with Pikeview personnel in Denver on December 13, <br /> 2019,The DRMS understands additional area just north of the maintenance shop and within the permit <br /> boundary is to be affected area. Rule 6.4.3(d) requires the total area involved in the operation be <br /> identified.The area north of the maintenance shop needs to be included in the green lines outlining <br /> various areas for which the Legend identifies as"Disturbance Area". Please resubmit C-1 and C-2 with <br /> the new borrow area included in the "Disturbance Area". Please provide the disturbance acreage on the <br /> re-submitted map(s). <br /> Response: The reclamation surface has been revised so that all the material required to backfill and <br /> reclaim the quarry comes from inside the existing permit/affected lands boundary. Castle will continue <br /> to import fill material from offsite projects to supplement or replace the material planned to be <br /> excavated from the site.The maps in Exhibit C have been updated to show the revised topography, <br /> disturbance boundary, and to clarify that the permit boundary coincides with the affected lands <br /> boundary. Exhibits D, E, F,G, and L have also been revised with these changes. <br /> The increased borrow areas were selected so there is no impact on the geotechnical stability of the <br /> backfilled quarry. The limestone ridge at the toe of the fill will remain to provide a buttress for the fill <br /> slope. <br /> 6.4.4 EXHIBIT D—Mining Plan <br /> 10. Fill Monitoring, p. D-3:The response requires additional clarification. Conversations during the <br /> December 5, 2019 site visit included three types of monitoring: visual, the existing prism system, and <br /> imaging using drones. Only the visual and prism systems were discussed in your response. Furthermore, <br /> Pikeview Quarry Amendment 4, Response to Adequacy <br /> January 7, 2020 <br />