My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-06_REVISION - M1996076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996076
>
2020-01-06_REVISION - M1996076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:17 PM
Creation date
1/7/2020 10:15:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996076
IBM Index Class Name
REVISION
Doc Date
1/6/2020
Doc Name
Request for Technical Revision
From
Rudolph Fontanari/Western Slope Flagstone, LLC
To
DRMS
Type & Sequence
TR3
Email Name
LJW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fr3 xik\i‘ COto <br /> `.� COLORADO Di T R 03 AAMATION, MINING AND SAFETY <br /> 1313 Sherman Colorado 80203 ph(303)866-3567/876 1/RECEIVED <br /> LJW/thm <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET JAN 0 6 MO <br /> File No.: M- 1996-076 Site Name:WSF Cameo Quarry #201VISION OF RECLAMATION <br /> MLNLN® <br /> &SAFETY <br /> County Mesa TR# (DRMS Use only) <br /> Permittee:Rudolph Fontanari/Western Slope Flagstone, LLC <br /> Operator(If Other than Permittee):Rudolph Fontanari <br /> Permittee Representative: <br /> Please provide a brief description of the proposed revision: N E <br /> Corrective actions recommended by local inspector including weed management inspection,additional permit boundary <br /> markers,refuse cleanup/contouring,and confirmation of fuel tank adequacyo — <br /> S 3 CD <br /> coa• b <br /> v <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or applicatioi - O3 <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or g <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitte o' <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a T <br /> the Division may require the submittal of a permit amendment to make the required or desired change <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the r <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will St <br /> determine if it is approvable within 30 days.If the Division requires additional information to approve ° O <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 E <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.