Laserfiche WebLink
4, at which point the pipeline is enlarged to 36" <br /> to carry an additional 11 cubic feet of water per <br /> second on a grade of 7 feet per 1,000 feet, and'a <br /> length of 700 feet to the point of discharge Into <br /> the East Branch Reservoir. <br /> .. ... .... .... .... .... <br /> d. Intake 4 --Lower Ute' Creek Thtake. <br /> Intake 4 is located at a point whence the 'South-; <br /> east Corner of Section 36, Township 2 South, Range <br /> 78 West of the 6th P.M., bears South 53°10' East <br /> 7,854.93 feet/Intake '4 diverts 11 cubic feet of <br /> water per second of time from an unnamed tributary <br /> of Ute Creek into the enlarged Ute Creek Pipeline, <br /> which from the intake has a diameter of 36", a <br /> grade of 7 feet per 1,000 feet and a length of 700 <br /> feet and a carrying capacity of 51 cubic feet per <br /> second, and discharges water into the East Branch <br /> Reservoir. <br /> e. Intake 5 - Lost Creek Intake. <br /> The point of diversion of the Lost Creek Intake <br /> is at the Lost Creek Pumping Station, located at a <br /> point whence A.P. 8 of Bureau of Land Management <br /> Exchange Survey No. 375 in the Arapahoe National <br /> Forest in unsurveyed Township 2 South, Range 78 <br /> and 79 West of the 6th P.M., located in Section <br /> 8, Township 2 South, Range 78 West bears North <br /> 87°58'0" West a distance of 3,278 feet, at the <br /> outlet works of the Lost Creek Dam! from which 20 <br /> cubic feet per second of water is pumped to the <br /> intake of the Mill Water Return Pumping Station <br /> at the Ute Park Tailing Pond initially through <br /> a 24" pipeline a distance of 17,500 feet at an <br /> - 7 - ` <br /> • <br /> 2i <br />