My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-23_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2019-12-23_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:06:28 PM
Creation date
12/26/2019 1:02:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
12/23/2019
Doc Name
Status Update
From
Climax Molybdenum
To
DRMS
Type & Sequence
AM7
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
intake through a 24" steel pipeline out of the <br /> Williams Pork River a distance of 5,400 feet against <br /> an adverse grade of 122 feet per thousand feet to <br /> the intersection of the Williams Fork Pipeline with <br /> the Ute Park Pipeline at which 'intersection pipeline <br /> capacity is enlarged to carry water pumped through <br /> the Ute Park Pipeline as well as water pumped <br /> through the Williams Fork Pipeline, for a distance <br /> of about 2,700 feet on a grade of 8 feet per 1,000 <br /> feet, discharging into the East Branch Reservoir. <br /> b. Intake 2 - Benderso's Mtl'1 Potable' Water Pi:eline. <br /> The headgate is located at a point whence the SE <br /> Corner of Section 36, Township 2 South, Range 78 <br /> West of the 6th P.M., bears/South 61°48'41" East <br /> a distance of 9407.35 feet/from which point water <br /> flows by gravity initially through a 6 inch pipe- <br /> line to the East Branch Pumping Station, a distance <br /> of 2,700 feet, with a grade of•7'feet per 1,000 <br /> feet and a carrying capacity of .62 cubic feet per <br /> second; and from the East Branch Pumping Station <br /> will be pumped into head tanks and then discharged <br /> by pipes to places of use. <br /> c. Intake 3 - Ute Creek Pipeline. <br /> The headgate of Ute Creek Pipeline is located at a <br /> point whence the SE Corner of Section 36, Township <br /> 2 South, Range 78 West of the 6th P.M., bears <br /> South 61°54'25" East a distance of 9,341.93 feet <br /> from which point 40 cubic feet per second of time <br /> will be diverted through the Ute Creek Pipeline <br /> with a diameter of 30", a grade of 7 feet per <br /> 1,000 feet and a length of 2,000 feet to Intake <br /> - 6 - <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.